Skip to main content

Pre-Construction Meeting for Drainage Requiring a Sediment Control Permit

The Department of Permitting Services requires a pre-construction meeting to be held with the Sediment Control Inspector prior to construction within any roadway or easement for which a Public Right of Way Permit is required. The Sediment Control inspector for each project is noted on the Sediment Control Permit along with the inspector's direct phone number. Call the inspector directly to schedule a pre-construction meeting time.

The Sediment Control inspector's name and telephone numbers are listed on DPS website. From the DPS website under the "Inspections" heading, select "Sediment Control" then click on "Sediment Control Inspector Area Map".

Find more information from the following link(s):
To speak with a Customer Service Representative, please call 311 during business hours.