Skip to main content

Site Plans are Required with a Sediment Control Permit Application or a Public Right of Way Permit Application

One set of plans and computations are required to be submitted for each type of sediment control application with the exception that Small Land Disturbance Applications must have two copies of the site plans. For Right of Way permits, provide two sets unless otherwise shown on the plan review checklists for storm drain and/or paving plan. Refer to the website (edocuments) for all checklists for Sediment Control and Right of Way permits.
Find more information from the following link(s):
To speak with a Customer Service Representative, please call 311 during business hours.